The restoration of the Erechtheion began during the reign of King Otto under Kyriakos Pittakis, initially with the assistance of the Archaeological Committee and subsequently of the Archaeological Society at Athens. Between 1837 and 1840, sections of the lateral walls of the cella were re-erected, the southernmost half-column of the west wall was set back in place, and the three half-columns then standing were linked by two epistyles. In the North Porch, the northwestern column was consolidated and the western column repaired, while in the South Porch the fourth Caryatid was reinstated and blocks of the south wall above the porch were reset. In 1844–1845, the remains of the Ottoman powder magazine were removed from the North Porch.

In 1846–1847, the French architect Alexis Paccard completed the restoration of the Porch of the Caryatids, carrying out extensive additions and replacements to its architectural members, including the abaci of several of the Maidens, the epistyles and the base of the porch. As part of the intervention, the sixth Caryatid from the west, which had been found in fragments in 1837 and had already been repaired by the Italian sculptor Andreoli, was reinstated, while a cast was placed in the position of the third Caryatid, which had been carried off by Lord Elgin.

Large-scale restoration works were carried out between 1902 and 1909 by Nikolaos Balanos, largely shaping the form the monument subsequently assumed. The works included extensive restoration of the North Porch and the west front of the monument, interventions on the East Porch, the raising of the south wall to the level of its crowning course, the restoration of the roofs of the North and South Porches, as well as major interventions on the Porch of the Caryatids, where the sixth Caryatid was repaired once again by replacing the corroded iron connectors from Andreoli’s intervention.

Εικόνα
modern
Video file